Stagnant Water and Mosquitoes Raise Concerns in Pallini Area

Residents in Pallini, near Athens, say an unmaintained stream has become a persistent source of mosquitoes and disruption, calling for permanent infrastructure solutions to prevent the problem from returning.

Residents in Pallini, a town in the Athens metropolitan area, are raising concerns over stagnant water in a local stream that they say has become a breeding ground for mosquitoes and a source of ongoing health and environmental concerns.

The stream, which remains uncleared, has collected standing water that has led to a significant increase in mosquito activity, according to residents. They say the issue has created a permanent nuisance for the surrounding neighborhood and has affected their daily lives.

Residents report growing problems

According to local residents, the stream accumulates stagnant water because it is located at the lowest point of Pallini and receives runoff from Mount Hymettus and the Kantza hill area.

They claim the conditions have created a constant source of insects and pollution concerns, making it difficult for people to spend time outdoors, especially during afternoon hours.

Residents have also expressed concerns about the possible spread of infectious diseases due to the prolonged presence of mosquitoes.

Calls for action from local authorities

Residents say they have repeatedly contacted the Municipality of Pallini and the Region of Attica, but claim they have received unclear responses and that no effective solution has been implemented.

They argue that the area requires regular maintenance, including cleaning vegetation and removing accumulated debris from the stream.

They also state that responsibility for the maintenance and cleaning of the stream lies with the Region of Attica, adding that they have been informed the project has already been included in a cleaning program.

Demand for a permanent solution

Residents are calling for long-term action rather than temporary measures. They have proposed that the project be included in the Region’s technical program, allowing infrastructure works such as underground piping and drainage improvements to be carried out.

Follow tovima.com on Google News to keep up with the latest stories
Exit mobile version